建筑工程的英语口语摘抄1

1、We should start the installation according to the instruction and operation manual、

2、This is a gate valve (check valve, butterfly valve, cut-off valve, magnetic valve, remote valve, relief valve, throttle valve, cock)、

3、系统水压试验(学习、加热试验、动力试验、实际开车)定于下星期一进行。

4、The alignment of the coupling should be performed by two dial gauges、

5、我的工具柜(工具盒、工具箱)里面有很多工具。

6、Straightedge rule (square rule, slide gauge, inside and outside micrometer, steel tape, feeler, dial gauge, depth micrometer, wire gage, radius gage, thread pitch gage) is a kind of mon measuring tool、

7、How many radial (axial ) clearnance are there in this bush (journal bearing , thrust bearing) ?

8、That is an air (electric) powered grinder (portable grinder, angle grinder, straight grinder, drill, impact wrench, riveting hammer, hammer drill)、

9、靠背轮的找正对准应用两只千分表来进行。

10、靠背轮找正的允许偏差为0、02毫米。

11、Does the bolt fit the nut?

12、这是一个闸阀(止回阀、蝶阀、切断阀、电磁阀、遥控阀、安全阀、节流阀、旋塞)。

13、我们已经准备好做实验(试验)的仪器(压力表、温度计、转速计、电流表、万用表)。

14、We need a piping material list (list of piping support, bill of welding rod )、

15、我们可以进行管子内壁的各种处理,诸如:喷砂、化学酸洗、冲洗和钝化。

16、Please explain the method of field test and flushing (blowing off )of the pipelines、

17、We have got the instrument (pressure gauge, thermometer, tachometer, current meter, universal meter) ready for the experiment (test)、

18、现场检查工作由我们的检查科管理(实施、指导)。

19、Do you know how to assemble (adjust )this new machine?

20、The precision of this fitter level (cross-test level) is 0、02mm/M、

21、那是一个气(电)动砂轮机(手持砂轮机、角型砂轮、直型砂轮、钻机、冲击扳手、铆钉锤、锤钻机)。

22、在装置初次开动以前,我们必须仔细地检查这些设备。

23、我们认为焊接比铆接好。

24、我们将为奥氏体不锈钢管的水压试验引进净水。

25、Our site quality inspector will report to the Project Manager everyday、

建筑工程的英语口语摘抄2

1、我们的现场质量检查员将每天向工程项目经理汇报。

2、这个轴套(轴颈轴承、止推轴承)的径向(轴向)间隙是多少?

3、The welding (heat treatment )of pipes have been carried out with incorporated programming、

4、The transfer medium in this pipeline is liquid ammonia (process air , soft water, alkali liquor, acidic gas)、

5、We prefer welding to riveting、

6、对于这个工程的全面质量管理将要加强。

7、Our electrical tools are double insulated and approved to international safety standards、

9、给我拿一把手锤(钢锯、锉刀、刮刀、凿子、套筒扳手、钩扳手、活动扳手、管扳手、棘轮扳手、开口扳手、螺丝刀、手钳、扁嘴钳、小刀)。

10、这条管线的输送介质为液氨(工艺空气、软水、碱液、酸性气体)。

11、这个装置的机械竣工检验表已由买方和卖方的代表审定。

12、There are many tools in my tool storage unit (tool chest, tool box)、

13、这个钳工水平仪(框架式水平仪)的精度为0、02毫米/米。

14、请说明管线的现场试验和冲洗(吹净)方法。

15、 We shall conduct the clean water for the hydrostatic test of the austenitic stainless steel pipe、

16、螺栓与螺母不配。

17、我们需要一份配管材料表(管架一览表、焊条明细表)。

18、管子的焊接(热处理)现已按照编写的程序完成。

19、全面质量管理(简称TQC)是一种较好的质量管理体系。

20、直尺(角尺、游标卡尺、内径和外径千分尺、钢卷尺、塞尺、千分表、深度千分尺、线规、半径规、螺距规)是一种常用量具。

21、保持施工工作的优良质量是现场管理人员的重要职责。

22、Total Quality Control(TQC) is a better quality control system、

23、TQC over the project will be strengthened、

24、这台机器安装工作完成以后就将进行试车。

25、你知道如何装配(调整)这台新机器吗?

建筑工程的英语口语摘抄3

1、 To maintain the best quality of the construction work is the important responsibility of the field controllers、

2、The maximum allowable misalignment of the coupling is 0、02mm、

3、We possess skilled technician and plete measuring and test instruments used to ensure the quality of engineering 、

4、我们拥有熟练的技术力量和齐全的检测手段,可以确保工程质量。

5、Field inspection work is handled (executed, directed )by our Inspection Section、

6、Before initial start-up of the installation, we must check the equipment carefully、

7、We have planned to finish the adjustment of the machine before Tuesday、

8、The systematic hydrostatic test (dry run , hot test, dynamic test, actual start-up ) is scheduled for next Monday、

9、Get me a hammer (hacksaw, file, scraper, chisel, socket, wrench, hook spanner, adjustable wrench, pipe wrench, ratchet wrench, open end wrench, screw driver, hand vice, pliers, pocket knife)、

10、我们应该根据说明书和操作手册来开动这个装置。

11、We shall put the machine to trial (test run) after the erection work has been finished、

12、The mechanical pletion check list of the unit has been approved by both of the Buyer’s and Seler’s representative、

13、 We can carry out various treatment for the inner surface of pipes, such as sanding , chemical pickling, purging and passivation、

14、我们计划在星期二以前完成机器的调试工作。

15、我们的电动工具都是双重绝缘的,并符合国际安全标准。

下一篇:冷到极致的网名(精选66句)
上一篇:教师节贺卡祝福语句子(精选42句)
相关文章
  1. 常用的英语口语句摘抄五(精选26句)

    常用的英语口语句摘抄五1
    1、The quality must be in strict conformity with that of sample、质量必须与样品一样。
    2、I can‘..

    daniel 0 2024-06-22

  2. 酒店英语口语的常用句子(精选41句)

    酒店英语口语的常用句子1
    1、请问贵公司与我们酒店有协议吗?
    2、I am sorry I beg your pardon、
    3、冷气(电视、灯)无法开启。
    4..

    daniel 0 2024-06-21

  3. 工程英语口语常用句子和词汇(精选1

    工程英语口语常用句子和词汇1
    1、Smoking and lighting fires are strictly forbidden at here、
    2、为新建或改建港口与航道和相..

    daniel 0 2024-06-21

  4. 日常医学英语口语句子(精选19句)

    日常医学英语口语句子1
    1、His knee is misshapen or unable to move、
    2、He has passed more gas than usual、
    3、He feels bl..

    daniel 0 2024-06-21

  5. 中考英语口语备考常用句子(精选42

    中考英语口语备考常用句子1
    1、Fame is a magnifying glass、名誉是放大镜。
    2、 你好快一点儿。 You’d better get a move on、..

    daniel 0 2024-06-21

  6. 法律英语口语句摘抄分享(精选34句)

    法律英语口语句摘抄分享1
    1、The defendant was in court for three hours、
    2、The defendant applied for an extension of tim..

    daniel 0 2024-06-20

  7. 托业英语口语常用句子(精选44句)

    托业英语口语常用句子1
    1、hi, we need a table for two, please、
    2、i'd like to have some local food、
    3、 I want somethi..

    daniel 0 2024-06-19

  8. 中考英语口语常用句子(精选18句)

    中考英语口语常用句子1
    1、Mom:Good!You can benefit by daily exercise、很好!每天做操会对你有好处。
    2、Mom:Wash your face a..

    daniel 0 2024-06-19